What has to be ready on template day?

In brief. The site survey is the act the stone gets cut to: it is the last time anybody looks at the real site instead of the drawing. A survey taken on a site that is not ready does not produce a visible error that day โ€” it produces the wrong piece two weeks later. The list of what has to be there is short, and it holds for one kitchen as much as for fifty bathrooms.

The list, and the reason for every line

Why the survey is taken with the units fitted

Because a drawing is an intention and a site is a fact: the real thickness of end panels, feet adjusted to a floor that is not level, a plinth set back, plaster heavier in one place than another. The units can afford it because they are separate modules and the millimetres are shared out; a stone worktop is a single rigid piece, so the error piles up at one end. On how this changes the order of work when the supply is split between two firms there is the page on fabricator or kitchen supplier.

Why the list really matters

It comes down to an asymmetry hardly anyone says out loud: a piece that is long gets trimmed, a piece that is short gets remade. A few millimetres over on a side that will not be seen is half an hour's work; a few millimetres under is a new slab. Stone cannot be lengthened, and adding a piece with a joint is a design decision, not a remedy to be applied wherever the error happened to fall (<a href="/en/guides/marble-top-without-seams">how far you can go without seams</a>). That is why anyone measuring an uncertain site leaves material on where they can; and where they cannot, they ask to come back.

What a proper survey looks like

Not like a phone call. It is a dated document, and it records the dimensions of the piece, the full run, the out-of-square as measured at both ends of every run, the cut-out positions, the direction of the vein and which edge stays visible. The instrument matters less than people think: a rigid template, profiles, a laser all do the job if whoever uses them goes to site. What matters is whose sheet it is: if the survey is taken by the firm that cuts the stone, the site as found is part of their job; if the measurements arrive on a third party's drawing, the workshop answers for the cut and not for the room.

If something is not ready

The survey can still be taken, but it becomes a survey with a reservation, and the reservation has to be written on the sheet: which condition was missing, what value was assumed in its place, and who answers if the piece does not fit. It costs nothing and moves the discussion from an opinion to a fact. What is not done is to take the survey in silence and hope the site catches up.

Is time lost waiting?

This is the misunderstanding behind most of these errors: people assume cutting is the long part and try to win that time by measuring early. In fact what follows the survey is measured in days โ€” cutting, cut-outs, edge, finishing, bonding โ€” while the long part comes earlier: finding the material, choosing the slab, getting it approved. Hence the right route: bring forward the purchase, not the measurement. The slab is chosen and reserved on the drawing, along with where the joints will fall (<a href="/en/guides/how-to-pick-a-marble-slab">how to pick a marble slab</a>); the cut stays the last act.

The pieces that do not depend on the room

A table, a top on its own frame, a washbasin: the reference is another object, not the site, and the measurement is taken from that object or from its working drawing. If the frame is made by someone else, the dimensions are asked of them in writing, with the tolerance stated (<a href="/en/guides/stone-top-existing-table">a stone top on an existing table</a>). The rule in one line: a top is measured against the object it rests on, at the moment that object stops moving.

On a hotel contract

Surveying fifty bathrooms is not a site visit: it is a line in the programme, after the wall finishes and before the slabs are ordered. The sample room exists to show the problem once instead of fifty times, and phased supply needs one survey per phase. Whoever coordinates has two dates to fix, and they are worth more than any tolerance: the survey date, and the date after which walls and units are not touched again (<a href="/en/guides/who-supplies-stone-tops-for-hotels">who supplies stone tops for hotels</a>). Here the sequence weighs more than the price of the single piece: when the supply arrives complete, documented and on time, the property opens and starts earning.

What to write into the order

How we work

A worktop is cut once, and that governs the order of things: first the measurement taken where the piece will go, then the working drawing, then the cut. We buy blocks at the quarry and produce the slabs in our own workshops, so the material is settled early: before production we send photographs of the selected slabs and the client indicates which part of them the piece comes from (<a href="/sostenibilita">the stone, the supply chain, the offcut</a>). For production we state four to eight weeks from approval, prototype included; the terms are set out in full in our answers to studios. For a contract supply the route is the Contract section.

How long does a survey take?

For one kitchen it is measured in hours, not days. What takes the time is the decisions still open: where the joint falls, how the edge turns, what shape the sink cut-out is. A long survey is almost always a survey in which design work is still going on.

Do I need to be there for the survey?

Somebody has to be there who can decide on the spot, because the survey closes choices the drawing left open. If that person cannot attend, those choices have to be settled in writing beforehand; otherwise whoever measures makes them.

Can a stone worktop cut too short be lengthened?

No. A piece can be added with a joint, but that is a design decision and not a remedy: a seam belongs where the drawing puts it, and on the wrong run it shows. A piece that is long gets trimmed, a piece that is short gets remade.

Can the survey be taken with the walls still to be tiled?

It can, but it becomes a survey with a reservation: a finish added afterwards does not make the piece short, it makes it too long. Whoever measures has to know the intended thickness, and the reservation has to be written on the sheet along with who answers if the piece does not fit.

Ask for a quotation The tables collection

This page sets out assessment and selection criteria; it quotes no prices, no intervention times and no company case studies. The fabrication indications are those of good stoneworking practice and have to be checked against the actual case, because they depend on the stone, the dimensions and the supporting structure. No technical standard is cited, because requirements change with the intended use of the room.