Is a stone worktop priced by the linear metre or by the square metre?
In short. Neither unit is wrong: they measure different things. The linear metre counts the run of the top at a given depth; the square metre counts the surface of stone. The price does not change because the unit changes: what changes is how much stays outside the number. Before putting two quotations side by side, it has to be written down what depth, what edge and what cutouts that price refers to.
Why one trade lives with two units
The linear metre comes from the furniture: a kitchen is designed in runs, the base units line up along a wall and have a current depth, so the top that closes them is described by its length and nothing else. The square metre comes from the stone: a slab is bought, moved and cut by surface, which is the quantity in which the material exists before anyone decides what shape it will take. The first is the unit of whoever sells the furniture, the second of whoever saws the stone.
They are two ways of invoicing the same work, and the figure next to the unit depends on how much that unit carries inside it. This is where the misunderstanding starts: two quotations written in different units look incomparable, and two quotations written in the same unit look comparable. Often the opposite is true.
What a price per linear metre takes for granted
A price per linear metre always comes attached to four implicit conditions, and none is written down:
- a depth. The price holds for that one and for no other. An island, a peninsula, a through bathroom top, a wide shelf all leave at once the dimension that price was built on;
- a thickness and an edge, usually the simplest arris. A mitred build-up, a radiused edge, a forty-five degree chamfer are different operations, with different times: what edge to give a stone top is a choice that is paid for separately;
- no cutouts. The sink opening, the hob cutout, the holes for tap and soap dispenser, a drainer grooved into the stone are piece work, counted by the piece;
- no vertical elements. Upstands, plinths and sides running down to the floor are almost always counted by the linear metre in their own right, with a price of their own.
None of this is improper: it becomes a problem only when the linear metre is read as if it covered the finished top, and the figures fail to add up because of items that were not hidden, they were absent.
Where the two units give different answers
- L-shaped and U-shaped runs. The same corner may fall inside both legs or inside one only, depending on how the supplier measures, and the difference between the two ways of counting is a whole section of worktop: which is why the run has to be asked for piece by piece, with length and depth, not as a total;
- Pieces deeper than normal. An island at double depth, counted by the linear metre, would cost the same as a narrow run of the same length: no supplier counts it that way, and for that piece the price is rewritten. Better to know in advance;
- Small pieces. A price per square metre applied to a small piece describes the work badly, because the time spent cutting, finishing and fitting does not shrink in proportion to the surface. It is the reason why, writing about how much a bespoke marble table costs, we say that smaller does not automatically mean cheaper;
- Net square metres and committed square metres. The first is the surface of the piece delivered, the second the stone that piece has consumed: a top is cut from a whole slab, and the whole slab is paid for — who owns the leftover stone does that sum at length. A clear quotation says which of the two it is invoicing.
What neither unit measures
Both measure geometry, which on natural stone is the least variable part of the price. They do not measure the stone: a commercial name does not identify a quarry, and between two materials called the same thing the price can differ several times over — the European naming standard asks for petrographic family, colour and precise place of origin beside the name, and telling quartzite from marble shows how much that line matters. A price per square metre without the exact name of the stone beside it is not a price.
They do not measure the yield of the slab, because where the figure of the stone falls decides where the offcut falls. Nor do they measure the hand: finishing an edge or polishing a curved arris are hours, and hours sit in neither unit. And they do not measure access, because who carries the stone top up, and who fits it are three distinct services with three distinct prices.
How to make two quotations comparable
There is no need to convert the units: ask both suppliers for the same six figures.
- the run in linear metres and the depth, piece by piece;
- the net surface and, where the supplier invoices the slab, the committed surface;
- the thickness and the edge profile of each piece;
- the list of piece work: openings, holes, drainers, chamfers;
- the list of vertical elements, each with its own unit;
- whether a minimum invoiced quantity applies, per piece or per operation.
With these six figures, two quotations in different units become comparable; without them, not even two in the same unit are. And if a supplier cannot say what depth his price per linear metre refers to, that figure is an estimate.
What to insist on in the order
The unit of measurement is not an administrative detail: it is the way the consideration is determined, and the Italian Civil Code deals with it. Article 1657 provides that where the parties have not determined the amount of the consideration, nor established the manner of determining it, it is calculated by reference to existing tariffs or to usage, and failing that it is determined by the court. In plain terms: if the unit is not written down, the person deciding will not be the one paying.
A private buyer has one further protection, in a precise case: in distance contracts and in contracts negotiated away from business premises, the Italian consumer code requires the trader to state the total price of the goods inclusive of taxes or, where the nature of the goods means the price cannot reasonably be calculated in advance, the manner in which the price is to be calculated. A quotation saying «by measurement, to be quantified on site» is therefore legitimate, and before the base units are fitted it is often the only honest form; but the manner of calculation — unit, reference depth, items by the piece and vertical elements — has to be written beside it.
How we work
We choose the block at the quarry face and work the stone in our own department in Cantù, in Brianza. We quote a piece on the piece: on the drawing, on the real dimensions and on the slab it will be cut from, with the items separated as set out above. On price, the logic of the intermediate steps applies: a reseller generally adds between 35 and 50 per cent to the maker's price, and a maker who imports the stone directly saves a further 20 per cent or so on the material. Those two margins add up, and they weigh more than any unit of measurement. For a project supply the route is the Contract section; the contacts reach the people who follow the work, and the tables show how we work when there is only one piece.
Frequently asked questions
On an L-shaped top, is the corner counted once or twice?
It depends on how the supplier measures, and that is why it has to be asked: the same corner can fall inside both legs, and on an ordinary kitchen the difference between the two ways of counting is a section of worktop. Ask for the run piece by piece, not for the total.
Is a minimum invoiced quantity normal practice?
It exists, and it should be asked about rather than assumed: on a small piece it can weigh more than the unit price. If the quotation does not say so, ask.
The quotation says «by measurement, to be checked on site». Is that normal?
Yes, and it is right when the base units are not yet fitted, because on a real wall the design dimensions almost never hold. What must accompany it is the manner of calculation: unit, reference depth and items by the piece. With those three, the site check changes the quantity, not the price.
Ask for a quotation The tables collection
This page describes units of measurement and criteria for comparison: it quotes no list prices, no response times and no company case histories. Article 1657 of the Italian Civil Code (determination of the consideration in a contract for work) is cited in its text in force. The duty to state the total price or, alternatively, the manner in which the price is to be calculated is the one in Article 49(1)(e) of the Italian consumer code (Legislative Decree no. 206 of 6 September 2005) and applies to distance contracts and to contracts negotiated away from business premises, not to every sale. The European standard on the naming of natural stone is cited for its subject matter, in the terms already set out in the guide on quartzite and marble, and without reproducing its text, which sits in the paid standard. The two percentages on the intermediate commercial steps are orders of magnitude, not price lists. The invoicing conventions described are market practice and vary from supplier to supplier: the valid figure is always the one written in the quotation in hand. Assessing an individual case is for whoever can see the place and the dimensions.